Dear Haworth Neighbors,
 
We appreciate your patience with the wait to pave Lakeshore Drive. We have held off for two reasons:
  • Doing the work while the construction was ongoing was not advisable due to the potential for additional damage;
     
  • Major paving during the winter months is not recommended due to the cooler temperatures. Temperature plays a significant role in adequately compacting the hot mix of asphalt. If the pavement is not compacted correctly, it dramatically affects the longevity of its lifespan.
We are soliciting bids now so that the project can begin in early Spring.
 
We thank you again for your continued patience.
 